ANWE Wood Chip Wharf, Eden NSWANWE Wood Chip Wharf, Eden NSWANWE Wood Chip Wharf, Eden NSW In June 2016 a devastating storm hit the East Coast of Australia resulting in a 17m wave destroying the Allied Natural Woodchip wharf in Eden NSW. The contract to rebuild a new wharf had critical time restraints and ANWE were desperate to find a contractor who would undertake such [...]Australian Seafoods Piling Works Bundaberg 2014Australian Seafoods Piling Works Bundaberg 2014Australian Seafoods Piling Works 2014 Removal of existing piles and pontoons at previous marina bay. Driving of piles, fitting of new sleeves and caps, and replacement of pontoons in new location. EWS, Fremantle WAEWS, Fremantle WAEWS, Freemantle WA EWS contacted Foreshore Marine when they were having difficulties with a design concept to undertake difficult to access piling works and a tight time frame. Not only did Foreshore Marine consult over the phone, but they also designed a purpose built pile frame to tackle the job. This proved to be successful [...]Fishmac Pontoon, Bundaberg QLDFishmac Pontoon, Bundaberg QLDFishmac Pontoon, Burnett River Bundaberg QLD Demolition, design and construction of retractable boat launching pontoon system. The Fishmac loading wharf facility was destroyed during the 2010 floods. Foreshore Marine were contracted to demolish the remaining structure and fabricate a new, state of the art retractable pontoon and boat launching system, specifically designed to withstand floods. [...]Francis Bay Multi-Use Loading Facility, Darwin NTFrancis Bay Multi-Use Loading Facility, Darwin NTFrancis Bay Multi-Use Loading Facility, Darwin NT Foreshore Marine were called in as consultants to problem-solve the laying of the difficult underwater rail system on this government project.GPC Gladstone Ports Corp Repairs BundabergGPC Gladstone Ports Corp Repairs BundabergGPC Gladstone Ports Corp Repairs Bundaberg Deconstruction of existing tug mooring dolphin in the port of Bundaberg which had been damaged during the Burnett River floods. We used our big hopper barge the IBIS II with the excavator mounted on deck for the job.Manly Boat Harbour Channel Entrance Maintenance Dredging – Manly QldManly Boat Harbour Channel Entrance Maintenance Dredging – Manly QldForeshore Marine carried out maintenance dredging of the entrance channel to Manly State Boat Harbour, Brisbane Qld for Department of Transport Qld TMR. The project involved ripping the hard rock bed using a ripper tooth on 65 ton excavator mounted on Ibis II barge. Once the ripping was complete, the material was loaded into the […] METRO Mining Balksite Loading Facility, Skardon River QLDMETRO Mining Balksite Loading Facility, Skardon River QLDThe Bauxite Hills Project is a DSO bauxite project located in far north Queensland, owned by Metro Mining Ltd. The project involves mining DSO bauxite, trucking to the barge loading facility, loading barges for transhipment to ocean going vessels in the Gulf of Carpentaria. Queens Wharf, Maryborough QLDQueens Wharf, Maryborough QLDQueens Wharf, Maryborough Qld As part of the Heritage Portside Precinct undertaken by the Maryborough City Council, Foreshore Marine were contracted to construct various projects including: Queens Wharf, a public viewing wharf in the Portside Parklands Public Wharf and Pontoon Rowers Club Pontoon and WalkwaySalvage OperationsSalvage OperationsSalvage Operations After the devistating 2013 floods, Foreshore Marine undertook a number of salvage operations of sunken vessels and structures. Using our barge PLB1 with mounted 25 ton crane, our team of four men salvaged a total of six vessels a shipping container and a pontoon structure.