Foreshore Marine carried out maintenance dredging of the entrance channel to Manly State Boat Harbour, Brisbane Qld for Department of Transport Qld TMR.
The project involved ripping the hard rock bed using a ripper tooth on 65 ton excavator mounted on Ibis II barge. Once the ripping was complete, the material was loaded into the barges hopper bins and then transported by Titan Tug to Mud Island dredge spoil grounds.